t-logo1.gif (148412 bytes) TESPL CO-GENERATION
top_line.gif (823 bytes)
line1.gif (163 bytes) leftcur.gif (933 bytes)

Enquiry Form For Co-generation System  :

 
Customer Name & Address 
  Contact Person  
Tel No. -      Fax No. - E-mail -
                 
 

1.0 Information on Present Electrical System & future requirements :

        Present Electrical Systems :
Morning Afternoon Evening Night
- Maximum Demand
- Average Demand
- Minimum Demand
- Daily Units Consumed
- Power Factor
- Tariff
      Future requirements of Electrical System :
Morning Afternoon Evening Night
- Maximum Demand
- Average Demand
- Minimum Demand
- Daily Units Consumed
- Power Factor
- Tariff
Incoming supply voltage from Electricity Board 
Plant Electrical voltage
Present Monthly Units Consumed - Minimum   :
                                               Average   :
                                                Maximum :


Present Monthly Electricity Bill     - Minimum   :
                                               Average   :
                                                Maximum :


Deposit paid to MSEB
Contract Demand with MSEB
Minimum Demand charges with MSEB
Is the plant and EOU project ?
Fuels available within proximity of the plant
 

2.0 Fuel Available & Prices :

  FUEL BASIC PRICE EXCISE DUTY SALES TAX TRANSPORT MODVAT SALES TAX SET OFF NET COST
  Petroleum Fuels
  Furnace Oil
  L.D.O
  H.S.D
  Natural Gas
  L.P.G.
  Biomass Fuels
  Bagasse
  Rice Husk
  Wood
  Palm Fruit Waste
  Groundnut Shell
  Sugarcane Waste
  Cotton Stalk
  Woods Chips
  Saw Dust
  Cashewnut Shell
  Coffee Shell
 
  Coal

3.0 Landed Utility Cost :

     POWER COST:Rs./ Unit    MAKE UP WATER COST:Rs./cu.m

4.0 Raw Water Analysis :

Total Solids Magnesium Hardness as CaCO3 Lime as CaO
Suspended Solids Total Hardness as CaCO3 Magnesium as MgO
Volatile Solids PH Colour
Silica As SiO2 Acidity / Alkalinity as CaCO3 Turbidity
Dissolved Iron as Fe Sulphates as SO Smell
Manganese as Mn Chlorides as Chlorine Electrical Conductivity
Calcium Hardness as CaCO3 Nitrate Nitrogen

5.0 Power Requirement (MW)

MAXIMUM MINIMUM NORMAL
PRESENT
FUTURE
 

6.0 Steam Quantity Requirement (KG/HR)

PRESSURE Kg/sq.cm (g) MAXIMUM MINIMUM NORMAL
PRESENT High Pressure
Low Pressure
Medium Pressure
FUTURE High Pressure
Low Pressure
Medium Pressure

7.0 Refrigeration Requirement : (TR)

TEMPERATURE MAXIMUM MINIMUM NORMAL
PRESENT
FUTURE

8.0 Chilled Water Requirement : (TR)

TEMPERATURE MAXIMUM MINIMUM NORMAL
PRESENT
FUTURE

9.0 Airconditioning Requirement : (TR)

TEMPERATURE MAXIMUM MINIMUM NORMAL
PRESENT
FUTURE

10.0 Cooling Water Available :

SUMMER WINTER MONSOON
TEMPERATURE MORNING
NOON
NIGHT
TR MORNING
NOON
NIGHT

11.0 Hot Water Requirement:

A)  OPEN LOOP :
TEMPERATURE  QUANTITY (CU.M/HR)
Feed Outlet MAXIMUM MINIMUM NORMAL
PRESENT    
   
FUTURE    
   
             
 

B) CLOSED LOOP:          

    TEMPERATURE QUANTITY (CU.M/HR)
    Feed Outlet MAXIMUM MINIMUM NORMAL
  PRESENT
 
  FUTURE
 
             
 

12.0 Hot Air Requirement :

  A) OPEN LOOP :
    Feed Temp Outlet Temp MAXIMUM MINIMUM NORMAL
  PRESENT
 
  FUTURE
 
             
  B) CLOSED LOOP :                        kcal/hr
    Inlet Temp Outlet Temp MAXIMUM MINIMUM NORMAL
  PRESENT
 
  FUTURE
 
             
 

13.0 THERMIC FLUID REQUIREMENT :              kcal/hr

    Inlet Temp Outlet Temp MAXIMUM MINIMUM NORMAL
  PRESENT
 
  FUTURE
 
             

14.0 Waste Water Evaporation / Desalination Load :

       Waste Water / Desalination Water Composition:
PH Ammonical Nitrogen Heaxavalent Chromium
Temp Chlorides Total Chromium
Total Suspended Solids Sulphates Copper
Total Dissolved Solids Sulphides Lead
BOD (3days at 27 Deg.C) Cyanides Arsenic
COD Nitrate Cadmium
Oil & Grease Phosphate Colour
Phenolic Compounds Insecticides / Pesticides Bio-Assay test
Total Dissolved Gases
  QUALITY OF EFFLUENT TO BE HANDLED     :
  PROPOSED USE OF EVAPORATOR WATER    :
  PROPOSED DISPOSAL OF CONCENTRATE     :
  MATERIAL OF CONSTRUCTION OF PLANT     : 
  Carbon Steel     AISI 304     AISI 316      OTHERS
             
 

( PLEASE MENTION THE SPECIFICATIONS OF REQUIRED APPLICATIONS )

 

[Home] [Case Studies] [Corporate Profile] [Technology Resource] [Technical Information] [Enquiry Form] [Quality Policy] [Terms & Condition] [Contact Us] [Download] [Links]